Software Development
1.

What is the first step in the software development lifecycle ?

A.  

System Design

B.  

Coding

C.  

System Testing

D.  

Preliminary Investigation and Analysis

2.

What does the study of an existing system refer to ?

A.  

Details of DFD

B.  

Feasibility Study

C.  

System Analysis

D.  

System Planning

3.

Which of the following is involved in the system planning and designing phase of the Software Development Life Cycle (SDLC) ?

A.  

Sizing

B.  

Parallel run

C.  

Specification freeze

D.  

All of the above

4.

What does RAD stand for ?

A.  

Rapid Application Document

B.  

Rapid Application Development

C.  

Relative Application Development

D.  

None of the above

5.

Which parameters are essentially used while computing the software development cost?

A.  

Hardware and Software Costs

B.  

Effort Costs

C.  

Travel and Training Costs

D.  

All of the above

6.

Which of the following model has a major downfall to a software development life cycle in terms of the coding phase ?

A.  

4GT Model

B.  

Waterfall Model

C.  

RAD Model

D.  

Spiral Model

7.

Software maintenance costs are expensive in contrast to software development.

A.  

True

B.  

False

8.

The agile software development model is built based on __________.

A.  

Linear Development

B.  

Incremental Development

C.  

Iterative Development

D.  

Both Incremental and Iterative Development

9.

On what basis is plan-driven development different from that of the software development process ?

A.  

Based on the iterations that occurred within the activities.

B.  

Based on the output, which is derived after negotiating in the software development process.

C.  

Based on the interleaved specification, design, testing, and implementation activities.

D.  

All of the above

10.

Which of the following activities is not applicable to agile software development ?

A.  

Producing only the essential work products.

B.  

Utilizing the strategy of incremental product delivery.

C.  

Abolishing the project planning and testing.

D.  

All of the above